Description
GIS Engineering & Environmental Services successfully delivered a multi-scope project for SP Ltd Rwanda, a key player in fuel storage and distribution across East Africa. The work involved the complete installation of fire safety pumping systems, vertical fuel tanks, and the full tie-in and integration of the pump house and piping systems. This critical infrastructure ensures operational safety, fuel flow efficiency, and compliance with regional standards.
Client: SP Ltd Rwanda
Project Title: Fire Pump Installation, Vertical Fuel Tank Installation, Pump House Tie-in & Piping System Installation
Location: Kigali, Rwanda
Sector: Petroleum Storage & Safety Infrastructure
Service Category: Mechanical Installation, Fuel Storage Engineering, Fire Protection Systems
The client required a technically sound and regulatory-compliant installation for newly procured storage tanks and fire pump systems. The main challenges included:
-
Precise mechanical installation in a live fuel depot
-
Integration of fire protection systems within existing facility layout
-
Ensuring airtight tank installation to avoid leakage or vapor loss
-
Coordinating multiple installations under limited operational downtime
Solution
GIS provided end-to-end engineering, installation, and commissioning services, ensuring every component met international safety and quality standards. Key solutions included:
-
Design and installation of a compliant fire pump system with jockey and diesel backup
-
Foundation preparation and anchoring of vertical fuel tanks
-
Precision piping works for fuel transfer and fire suppression
-
Full mechanical integration of pump house with fuel lines and control systems
-
Testing and commissioning with safety audit and training
Process
-
Pre-Installation Planning & Layout Design
Developed installation plans including 3D layouts, safety zones, and tie-in maps. -
Vertical Tank Installation
Anchored and erected steel fuel tanks on reinforced concrete foundations with leak prevention measures. -
Pump House Integration
Connected newly installed fire pumps to existing utility and fuel systems with safety valves and control panels. -
Fuel Piping & Valve Installation
Installed underground and above-ground piping from tanks to loading areas, with spill protection. -
System Testing & Commissioning
Performed hydrostatic and leak tests, flow testing, and emergency system simulations.
Results
-
Installed 2 Vertical Fuel Tanks (30,000+ liters each)
-
Commissioned Fire Pump System with dual backup
-
Achieved full compliance with RURA and international petroleum facility standards
-