GIS Engineering & Environmental Services was contracted by Acer Tanzania Limited, a leading technology and electronics company, to execute a series of civil works supporting the expansion of their Tanzanian operations. This included structural foundations, site preparation, floor slabs, and drainage systems, enabling the safe and efficient setup of critical ICT infrastructure and logistics operations.
Client: Acer Tanzania Limited
Project Title: Civil Works for Facility Expansion and Infrastructure Development
Location: Dar es Salaam, Tanzania
Sector: ICT, Commercial Infrastructure
Service Category: Civil Engineering, Site Development, Structural Works
Problem
The client required immediate and durable civil infrastructure to support expanding operational needs, including storage, server rooms, and office space. Challenges faced included:
-
Poor soil conditions requiring subgrade stabilization
-
Strict timeline to meet global IT deployment schedules
-
Utility integration (stormwater, power ducts) under constrained layout
-
Compliance with local municipal engineering codes
Solution
GIS delivered a full-scope civil engineering solution, from design to execution, ensuring all work met international structural and safety standards. Our work included:
-
Soil investigation and compaction for structural support
-
Concrete foundation and flooring for server/office infrastructure
-
Perimeter drainage and stormwater flow systems
-
Paved access roads, boundary wall baseworks, and landscaping
-
Coordination with utility teams for ducting and site electricals
Process
-
Site Assessment & Soil Testing
Conducted geotechnical surveys to ensure proper foundation design and longevity. -
Civil Design & Layout Planning
Produced detailed engineering drawings, construction plans, and work sequencing. -
Earthworks & Structural Foundations
Executed excavation, backfilling, subgrade stabilization, and reinforced concrete casting. -
Drainage & Water Flow Management
Installed surface and underground drainage to prevent flooding and erosion. -
Finishing & Handover
Delivered site grading, compacted road base, and project documentation to client.
Results
-
100% on-time delivery within 10-week construction period
-
Engineered structures ready for ICT and commercial use
-
Improved site access, durability, and water management
-
Full compliance with Tanzanian building codes and municipal approvals